Contract Assembly Services for Turnkey and Consigned Programs
Dedicated assembly cells, BOM purchasing, line-ready kitting, and full system integration managed under one accountable contract manufacturer.
- Turnkey, consigned, or hybrid sourcing with upfront NDA protection
- Build-to-print sub-assembly, mechanical, box build, and product lines
- Scalable from 10 pilot units to 10M+ builds with no MOQ
- 30+ YearsContract assembly experience
- Thailand & ChinaOwned plants + US/CA warehouses
- IATF 16949:2016Certified assembly lines
- 24 HoursQuote & DFA review
Our Contract Assembly Capabilities
Offload capital equipment, fixture engineering, and assembly labor. We structure dedicated assembly programs around your exact bill of materials and volume curve.
- 01
Mechanical Sub-Assembly
Precision fastening, pressing, riveting, and welded modules built via our mechanical assembly services.
- 02
Electromechanical Box Build
PCBA mounting, enclosure integration, wire harnessing, and system test via box build assembly.
- 03
Complete Product Assembly
Part fabrication through retail pack-out for finished goods via our product assembly services.
- 04
Kitting & Kanban Programs
Pre-sorted, barcode-verified component kits and sub-modules packed to feed your own final assembly line.
- 05
BOM & AVL Management
Vendor consolidation, authorized hardware purchasing, and buffer stock via supply chain management.
- 06
Dedicated Assembly Cells
Custom manual benches, semi-automatic stations, or automated robotic lines scaled to your annual forecast.
Swipe to see all six capabilities.
Turnkey vs. Consignment Contract Assembly
Choose who controls component purchasing. Many OEMs launch on consignment for pilot builds, then transition to turnkey manufacturing to cut vendor count.
Turnkey Contract Assembly
Meco fabricates custom parts in-house across 40+ processes, buys commercial BOM hardware, kits, assembles, tests, and ships under one PO.
Best for: OEMs consolidating suppliers and lowering landed cost.
Consigned / Hybrid Assembly
You ship free-issue parts from your Approved Vendor List (AVL); Meco provides the fixtures, labor, quality control, and – in hybrid programs – fabricates the remaining parts.
Best for: teams with proprietary chips or locked supplier contracts.
Design for Assembly (DFA) & Line Transfer Engineering
Moving an existing build or launching a new assembly line requires more than bench space. Before cutting fixtures, our R&D engineering team establishes:
- Poka-yoke (error-proof) assembly jigs, torque tooling, and custom test fixtures
- Standard Operating Procedures (SOPs), visual work instructions, and line balancing
- PFMEA risk analysis, control plans, and incoming inspection criteria for consigned parts
- Cell layout optimization to cut handling time and reduce unit assembly cost by 15–30%
We execute mutual NDAs before you share drawings. All custom fixtures and tooling built for your program remain your property.
Scale Output Without Adding Factory Overhead
Send your BOM, assembly drawings, and target volumes. Get a costed contract assembly quote with DFA feedback in 24 hours.
Our Outsourced Contract Assembly Process
Six structured stages to launch a new build or transfer an existing assembly line into our tariff-flexible Thailand or China facilities.
NDA & BOM Audit
Sign NDA, review drawings, BOM, volumes, and turnkey vs. consigned scope.
DFA & Line Plan
Confirm cycle times, cell layout, fixture design, and unit pricing.
Tooling & Kitting
Build assembly jigs, receive consigned parts, or fabricate turnkey components.
Pilot & FAI Run
Run first-article trial builds to prove takt time, fit, and SOPs.
Volume Assembly
Execute production under IATF 16949 SPC controls and inline verification.
Stock & Fulfill
Hold safety stock and ship JIT via our warehousing and fulfillment network.
Contract Assembly Quality Control and Traceability
Auditing a broker means nothing if they subcontract your build. Meco owns its assembly plants and runs every program under one quality system.
| Stage | What we check | Records |
|---|---|---|
| Receiving (IQC) | Consigned & turnkey parts checked via CMM (to ±0.002 mm) against BOM | ERP lot & attrition logs |
| In-Line (IPQC) | ISO 5393 torque verification, poka-yoke sensors, and IEC 61340 ESD controls | Digital line travelers |
| Release (OQC) | 100% functional or pressure test, kit count verification, and barcode serialization | FAI & PPAP documentation |
Certified to IATF 16949:2016 and ISO 9001:2015 across 36,000 m² of owned factory floor. (Note: Meco does not hold AS9100, ISO 13485, or ITAR registration.)
Outsourced Assembly Programs and Applications
Sub-Assembly & Modules
Pre-built mechanical and fluid sub-systems shipped directly to your final OEM assembly plant.
Line Transfer & Scaling
Moving manual in-house builds to dedicated semi-auto or automated cells to free up your floor space.
Multi-Vendor Consolidation
Combining machined, cast, molded, and PCBA parts onto a single contract assembly PO.
Kanban & Service Kits
Aftermarket spare-part kits, hardware packs, and barcode-labeled field replacement assemblies.
Swipe to see all program types.
Custom build-to-print programs tailored to OEM specifications and delivery schedules.
What We Need to Quote Your Contract Assembly
Send your current documentation. We sign an NDA first and can quote from an initial package.
- Bill of Materials (BOM) indicating which lines are turnkey vs. customer-consigned
- 3D CAD models (STEP) and 2D assembly drawings with critical tolerances and torque specs
- Existing work instructions, test procedures, or cycle-time targets (for line transfers)
- Quality documentation requirements (FAI, PPAP level, serialization, or lot traceability)
- Pilot quantity, annual forecast, batch release schedule, and destination warehouse
Need local Kanban buffer stock in North America? We hold assembled inventory in our US and Canadian facilities for Just-In-Time (JIT) call-offs.
Frequently Asked Questions
What is the difference between contract assembly and contract manufacturing?
Contract assembly focuses on kitting, joining, testing, and packaging components into sub-assemblies or finished goods. Contract manufacturing is broader and includes fabricating the raw components first. Because Meco owns 40+ part-manufacturing processes alongside dedicated assembly cells, you can start with assembly-only and transition to full turnkey manufacturing without switching suppliers.
Should we choose turnkey, consigned, or hybrid contract assembly?
Choose consigned assembly if you have proprietary components or locked pricing with existing Approved Vendor List (AVL) suppliers. Choose turnkey assembly if you want one purchase order, lower landed cost, and a single accountable partner for both part fabrication and build. Many OEMs use a hybrid model – consigning specialty electronics while Meco fabricates the metal and plastic parts in-house.
How are contract assembly services priced?
We provide a transparent unit price broken down into assembly labor (based on takt time and station count), NRE for custom fixtures and test jigs, packaging, and BOM component costs (for turnkey items). Upfront Design for Assembly (DFA) reviews typically reduce unit assembly cost by 15 to 30% before fixtures are built.
Do you accept standalone sub-assembly or kitting programs with no MOQ?
Yes. There is no minimum order quantity (no MOQ). We build standalone sub-assemblies, aftermarket spare-part kits, and complete products from 10-piece pilot runs up to 10 million+ units per year, scaling from manual benches to automated lines as your demand grows.
How do you manage quality and inventory for customer-consigned parts?
Consigned shipments undergo incoming quality control (IQC) against your drawings, are logged into our ERP by lot and serial number, and are stored in bonded, ESD-safe areas. Your quotation clearly defines attrition allowances, incoming inspection scope, and real-time inventory reporting.
How fast can you transfer or launch a contract assembly line?
We return costed quotes with DFA feedback in under 24 hours. Prototype and pilot builds ship in 1 to 2 weeks, while custom assembly fixtures, poka-yoke stations, and dedicated line setups take 3 to 6 weeks depending on automation complexity.
How to Get Started
Share any 3D models, BOM, drawings, or details. We can get started with just an idea.
Get your transparent quote in 24 hours, featuring expert DFM comments to reduce costs.
We build your custom molds or tools in 3 to 6 weeks, and you retain full ownership.
Before the final run, we inspect first-article samples and send you a detailed quality report.
Meco handles everything from the idea stage, full production, to worldwide delivery.
Send Your Files, Get a Reply in 24 Hours
Prototype or production, we review every request and reply with clear next steps.
- Engineering feedback with every quoteWe review your files and reply with manufacturing feedback that can reduce cost.
- Send what you haveUpload drawings or 3D models, or describe the part and we'll help define the rest.
- Prototype to production, no minimum orderStart with one sample and scale to repeat production runs.
- One partner, 40+ processesMachining, casting, forging, stamping, finishing and assembly, under an IATF 16949:2016 quality system.
By submitting, you agree to Meco’s privacy policy. We’ll never share your information.
