Warehousing and Logistics That Finish the Job
Meco stores, packs, and ships the products we build. One partner moves your goods from our factory floor to your customer, with stock you can check any time.


One System, Not Three Handoffs
Most supply chains break at the handoffs. Goods pass from the factory to a warehouse, then to a freight company, and the stock data gets lost on the way.
Meco makes the parts, assembles the product, then stores and ships it. You get one stock record, one contact, and one invoice. It works alongside whole product manufacturing, so a program can grow from a first run to steady global orders.
Goods are inspected on arrival and racked with FIFO rotation and lot tracking, supplied through JIT, VMI and safety stock programs, then picked, packed and shipped on one landed cost invoice.
What Is Included
Six services that carry your product from the factory floor to your customer, all under one IATF 16949:2016 quality system.
Global Distribution Network
Stock held in the US (Ohio and Florida), Canada, Japan (Tokyo and Osaka), and Thailand, close to your demand.
Inventory Programs
JIT, VMI, safety stock, and forecast buffers match supply to your build schedule and demand swings.
24/7 Portal Visibility
Check stock levels, order status, and shipment milestones at any hour, from any time zone.
FIFO, COA and Lot Tracking
First in, first out rotation with certificates of analysis, so the paper trail runs from the line to the door.
Kitting, Packaging and Labeling
Parts grouped into ready to use sets, packed and labeled to your spec, retail ready or direct to customer.
Freight and Landed Cost
Sea, air, and courier shipments booked for you, billed as one landed cost with product, freight, and duty in one line.
Which Inventory Program Fits You?
Different demand patterns need different stock models. Here is how the five programs compare.
Comparison of Meco's five inventory programs: JIT, VMI, safety stock, forecast buffering and kitting
Swipe sideways to compare the programs.
Not sure which fits? Meco reviews your demand and suggests the right mix.
Want a Steadier Supply Chain?
Tell us your products, volumes, and destinations. We will suggest where to hold stock and which programs to run.

From Factory Floor to Final Door
Every program runs the same five steps. Because assembly and warehousing sit under one roof, there is no second supplier and no second quality file.
1. Receive and Inspect
Checked on arrival. Finished goods are checked, and the COA and lot number are recorded.
2. Store and Map
Accurate counts. Stock is racked with FIFO rotation and a digital location.
3. Plan and Refill
Refilled before you run short. JIT, VMI, and buffer rules trigger the next replenishment.
4. Pick, Kit and Pack
Packed to your spec. Orders are picked, kitted, and packed with your labels and pack out spec.
5. Ship and Track
One landed cost. Freight is booked and tracked, with one landed cost invoice at the end.
Swipe sideways to see all five steps →
Stock on Both Sides of the Pacific
Manufacturing in Thailand and China, warehousing across North America and Asia, and engineering support in the US.
Ohio and Florida
United States. Two distribution centres for fast domestic delivery and inbound consolidation.
3,000 m² Warehousing
Canada. Supported by Meco's head office in Richmond Hill, Ontario.
Tokyo and Osaka
Japan. In market stock for quick supply to Japanese OEMs.
20,000 m² Plant and Warehouse
Thailand. Production and storage on one site, so goods reach stock the same day.
Swipe sideways to see all locations →
Warehousing FAQ
What is included in Meco's warehousing service?
Storage in five countries, JIT and VMI programs, safety stock, kitting, packaging, labeling, freight booking, and one landed cost invoice. A 24/7 portal shows stock and orders.
What is the difference between JIT and VMI?
JIT times each delivery so parts land when your line needs them. VMI goes further: Meco watches your stock and refills it to an agreed level, so your team does no planning. Many programs use both.
Where are the warehouses?
The US (Ohio and Florida), Canada, Japan (Tokyo and Osaka), and Thailand. Manufacturing runs in Thailand and China, with engineering support in the US.
How do you keep traceability in the warehouse?
Stock rotates on FIFO, and every lot carries its certificate of analysis. The record runs from the production line to the final shipment under our IATF 16949:2016 quality system.
What is landed cost invoicing?
One invoice covers the product, freight, duties, and handling. You see the true total cost instead of stacking three vendor bills and guessing at the rest.
Will it scale as my volume grows?
Yes. Warehousing sits on the same systems as manufacturing, so programs run from 10 pieces to 10 million and up. There is no new logistics vendor to qualify.
How to Get Started
Share any 3D models, drawings, or details. We can get started with just an idea.
Get your transparent quote in 24 hours, featuring expert comments to reduce costs.
We build your custom molds or tools in 3 to 6 weeks, and you retain full ownership.
Before the final run, we inspect samples and send you a detailed quality report.
Meco handles everything from the idea stage, full production, to worldwide delivery.
Related Solutions
Whole Product Manufacturing
Concept, tooling, parts, assembly, and delivery under one IATF 16949:2016 system.
View whole product manufacturing →
Supply Chain Management
Procurement, production, and logistics in one plan, cutting lead time 30 to 50%.
View supply chain management →
Contract Assembly Services
Mechanical, product, and box build assembly that feeds straight into kitting and shipping.
View contract assembly →Get Your Free Quote
No commitment · Response in under 24 hours
- Reply in under 24 hoursEvery request is reviewed by our team, and you get clear next steps.
- Send a drawing, a 3D file or just an ideaUpload what you have, or describe the part and we'll help define the rest.
- IATF 16949:2016 quality systemDocumented processes from first sample to volume production.
- One partner from prototype to productionMachining, casting, stamping, finishing and assembly under one roof.
By submitting, you agree to Meco’s privacy policy. We’ll never share your information.
