Availability: | |
---|---|
| |
Advantages:
a) High accuracy and coinsistance.
b) Zinc material included Zamak2, Zamak 5,Zamak 3,Zamak27 and son on.
c) Short lead time for tooling development and manufacturing, from 15 days to 25 days.
d) Low cost mold can be customized per low volume products.
e) Thoughtful DFM analysis and engineering support could be offered before project launching and tooling development, including flow analysis.
f) Any type of tests could be offered, like life test, strength test, non-dustructive test and so on.
g) Any type of surface finish could applied, like plating,powder coating, painting, E-coating and so on.
Advantages:
a) High accuracy and coinsistance.
b) Zinc material included Zamak2, Zamak 5,Zamak 3,Zamak27 and son on.
c) Short lead time for tooling development and manufacturing, from 15 days to 25 days.
d) Low cost mold can be customized per low volume products.
e) Thoughtful DFM analysis and engineering support could be offered before project launching and tooling development, including flow analysis.
f) Any type of tests could be offered, like life test, strength test, non-dustructive test and so on.
g) Any type of surface finish could applied, like plating,powder coating, painting, E-coating and so on.